Salesforce Project Management Software by Aprika

1.61

Release Notes, Version - 1.61

Mission Control Version 1.61 Release Notification
17 June 2022

A new version of Mission Control (version 1.61) will be released on the AppExchange on Friday 17th June 2022. This notification has been issued to existing Mission Control users. It contains an overview of the new features available with this release, along with instructions on how to upgrade to the new version.

What’s New?

This release includes a number of new features, along with some enhancements to existing functionality, including:

  • Gantt Chart Enhancements
  • Start Date + Working Days
  • Dependency Enhancements
  • Dependency Notifications
  • Timesheet Enhancements
  • Scheduler Enhancements
  • Whiteboard Enhancements
  • Role Utilisation Report Enhancements
  • Resource Assignment Wizard Enhancements
  • And a few minor enhancements
    • Force Financials Recalculation
    • Role Trigger Enhancements
    • Checklist Board Enhancements
    • Role Forecast Component Enhancements

Let’s get stuck into the detail…

Gantt Chart

A number of new features and enhancements have been added to the Gantt Chart. Each feature is detailed below.

Start Date + Working Days

When creating Actions within the Gantt Chart, rather than specifying the Start Date and End Date, you are able to specify the Start Date and the Working Days.

Whether creating the Action via the inline edit feature or by clicking the + icon and creating via the Action Modal, you are able to specify the Start Date and you can choose to either specify the End Date or the Work Days. Whichever field you specify, the other will automatically update to reflect the value of the other.

Completion % Slider

The slider feature on the Action bar within the Gantt Chart enables you to adjust the Completion % field on the Action record. When you use the slider, it will update the Completion % field and the Action will be considered to be manually overridden. Therefore, if Time Logs are created for this Action they will not automatically increase the Completion %, it will continue to need manual adjustment.

The Completion % slider is a triangular button accessible at the bottom of the Action bar, as shown below.

1. Gantt Chart Completion Slider

You are able to drag that forwards and backwards to increase or decrease the Action ‘Completion %’ field value as required.

2. Gantt Chart Completion Slider Completed

This slider feature can be turned on / off as required via the Gantt Chart settings controlled by the individual User or centrally via the Control Pad of the Mission Control Console.

3. Gantt Chart Slider Setting

When this setting is set to FALSE, the triangular slider will not be accessible.

Load to Today

By default, the Gantt Chart loads to the first day of the Project. There is a custom setting that enables you to choose the default loading action from the following options:

  • Project Start Date
  • Today

This setting can be controlled via the Gantt Chart settings controlled by the individual User or centrally via the Control Pad of the Mission Control Console.

4. Gantt Chart Timeline Default Setting

This setting controls the initial load behaviour. You are also able to quickly jump from the Project Start Date to Today, and vice versa by clicking the 5. Gantt Chart Date Picker button.

Converted to Visualforce Page

A number of customers were experiencing intermittent issues with the Gantt Chart that were being caused by Lightning Experience caching duplicate instances of the Gantt component during one browser session. This would result in a variety of errors, such as the Gantt not loading after editing the Project, the dependency logic within the library not being fully loaded, etc.

To provide a more stable environment for the Gantt Chart, it has been completely redeveloped within the Visualforce framework, removing the need for a Lightning Component. Therefore removing the caching issue.

There is no action required to take advantage of this enhancement.

Start Date + Working Days

When creating Actions within any of the components listed below, rather than specifying the Start Date and End Date, you are able to specify the Start Date and the Working Days.

  • Create Actions Page
  • Track Pad – Add Action
  • Scheduler – Add Action
  • Project Builder – Add Action
  • Whiteboard – Add Action

You are able to specify the Start Date and you can choose to either specify the End Date or the Work Days. Whichever field you specify, the other will automatically update to reflect the value of the other.

Business Hours Settings, Holidays (individual, Team and Global) as well as non working days specified on the Role’s ‘Role Hours’ records are all taken into account when calculating Working Days and End Date.

Dependency Enhancements

A number of additional Dependency options have been added to provide greater flexibility in managing predecessor relationships.

Previously you were able to create ‘Finish to Start’ or ‘Start to Start’ relationships. The parent in the relationship could be the Milestone or the Action and the child always had to be an Action.

The enhancements included in this release provide additional relationship types as well as greater flexibility in which records can be the parent and the child.

Dependencies are displayed on the Gantt Chart with orange connecting lines. Note, if the dependency forms part of the ‘Critical Path’, then the line will be red.

You are able to create any of the following relationship types:

  • Finish to Start
  • Start to Start
  • Finish to Finish

Finish to Start

A Finish to Start (FS) dependency means the child record in the relationship cannot start until the parent record is finished. If the End Date of the parent record is adjusted, the FS relationship will ensure the child record is rescheduled accordingly to ensure it starts once the parent is completed. Below is an example of a Finish to Start dependency.

6. Gantt Chart Finish to Start Dependency

Start to Start

A Start to Start (SS) dependency means the child record in the relationship should start once the parent record has started. If the Start Date of the parent record is adjusted, the SS relationship will ensure the child record is rescheduled accordingly to ensure it starts on the same day as the parent. Below is an example of a Start to Start dependency.

7. Gantt Chart Start to Start Dependency

Finish to Finish

A Finish to Finish (FF) dependency means the child record in the relationship can only be marked as complete once the parent record has been completed. If the End Date of the parent record is rescheduled to extend beyond the End Date of the child record, then the child record’s End Date will also be rescheduled. Below is an example of a Finish to Finish dependency.

8. Gantt Chart Finish to Finish Dependency

Lead & Lag

You can specify Lead or Lag on a Dependency. Lead indicates the child can start x days before the relationship trigger point. Lag indicates the child can start x days after the relationship trigger point. For example, the parent Action below has a duration of 3 days. There is a Finish to Start dependency between the two Actions. The dependency has 1 day of Lead applied to it. This means the child record can start 1 day before the parent record is completed.

9. Gantt Chart Dependency Lead

In the example below, there is 2 days of Lag applied. This means the child record will start 2 days after the parent record is completed.

10. Gantt Chart Dependency Lag

You can add Lead / Lag to a dependency by double-clicking on the dependency line. This will open up a pop up where you can set the Lead or Lag value.

11. Gantt Chart Dependency Modal

Supported Dependencies

You have the ability to specify both the parent and the child from the following records:

  • Milestone
  • Action
  • Checklist Item

Certain relationships are not supported due to the roll up of dates between Milestones, Actions and Checklist Items. For example, you are unable to create a Finish to Start relationship between a Milestone and one of the Actions contained within that Milestone. The reason behind this is that the End Date of the Milestone is driven by the latest of the End Dates of all related Actions. Another example is where you are unable to add Lead to the child record in a Start to Start relationship between a Milestone and one of the Actions contained within that Milestone. The reason behind this is that the Start Date of the Milestone is driven by the earliest of the Start Dates of all related Actions.

The table below provides an overview of all supported dependencies, indicating whether they are possible within the same family tree structure and across different family tree structures. The term Family Tree is used in context of identifying whether the child record relates directly to the parent record. For example, Action A relates to Milestone A, and is therefore in the same family tree structure. Therefore certain dependencies will not be available. However, Action B relates to Milestone B so a dependency between Milestone A and Action B would be crossing between two different family tree structures and therefore would be possible.

Dependency Type Parent Child Same Family Different Family
Finish to Start Milestone Milestone N/A Yes
Finish to Start Milestone Action No Yes
Finish to Start Milestone Checklist Item No Yes
Finish to Start Action Milestone No Yes
Finish to Start Action Action Yes Yes
Finish to Start Action Checklist Item No Yes
Finish to Start Checklist Item Milestone No Yes
Finish to Start Checklist Item Action No Yes
Finish to Start Checklist Item Checklist Item Yes Yes
Start to Start Milestone Milestone N/A Yes
Start to Start Milestone Action Yes – No Lead Yes
Start to Start Milestone Checklist Item Yes – No Lead Yes
Start to Start Action Milestone N/A Yes
Start to Start Action Action Yes Yes
Start to Start Action Checklist Item Yes – No Lead Yes
Start to Start Checklist Item Milestone N/A Yes
Start to Start Checklist Item Action N/A Yes
Start to Start Checklist Item Checklist Item Yes Yes
Finish to Finish Milestone Milestone N/A Yes
Finish to Finish Milestone Action No Yes
Finish to Finish Milestone Checklist Item No Yes
Finish to Finish Action Milestone Yes Yes
Finish to Finish Action Action Yes Yes
Finish to Finish Action Checklist Item No Yes
Finish to Finish Checklist Item Milestone Yes Yes
Finish to Finish Checklist Item Action Yes Yes
Finish to Finish Checklist Item Checklist Item Yes Yes

Creating Dependencies

You are able to create dependencies from within the Gantt Chart Data Table or within the Gantt Chart Timeline.

Data Table

To add a dependency within the Data Table, you can view two Columns, ‘WBS’ and ‘Predecessors’. These two columns can be toggled on / off within the Gantt Chart settings, as shown below:

12. Gantt Chart Working Days Setting

When this setting is true, the WBS and Predecessor columns will be visible within the Gantt Chart Data Table, as shown below:

13. Gantt Chart Working Days Data Table

The real power of this feature is the ability to create ‘Dependencies’ directly within the Data Table. To create a Dependency, click into the Predecessor cell for the child Action, as shown below:

14. Gantt Chart Predecessors Data Table

Enter the WBS number for the parent record (e.g. Action or Milestone). In the example above, we are making the ‘Deliver Training’ Action a child to the ‘Prepare Training Materials’ Action in a Finish to Start relationship. So we enter 1.3.1 into the Predecessor field.

15. Gantt Chart Predecessors Data Table 2

Once the WBS number has been populated, press the Enter key and the Dependency relationship will appear within the Gantt Chart, as shown below:

16. Gantt Chart Predecessors Data Table 3

If you wish to create a Start to Start relationship, you must enter SS after the WBS number (e.g. 1.3.1SS). If you wish to create a Finish to Finish relationship, you must enter FF after the WBS number (e.g. 1.3.1FF).

If you wish to add Lead or Lag to the relationship, you must enter -n or +n after the WBS number (e.g. to add a 2 day Lead, enter 1.3.1+2).

Timeline

To add a dependency, click on the circle that appears at the start or end of the bar for the parent record when hovered over, and then drag to see a dotted line appear. Drag the dotted line to the circle that appears at the start or end of the bar for the child record. Once you let go it should appear as a solid orange line, indicating the dependency has been added.

17. Gantt Chart Drag Dependency Creation

Remember, you will still need to save the Gantt Chart to save this dependency. If a line does not appear, it likely means the type of dependency you are trying to create is not supported and you will see a notification in the top right of the Gantt indicating ‘Link Type Not Supported’.

Deleting Dependencies

You can delete the dependency by double-clicking on the relationship line and clicking the Delete button. Alternatively, you can delete the value in the Predecessor column of the Data Table.

Enforcing Dependencies

Dependency enforcement logic is available for dependencies. This logic is controlled by a field on the Project Object called ‘Enforce Dependency Validation’. If this field is set to TRUE, the following logic will be applied:

  • For the child in a Start to Start relationship, ensure no parent records (e.g. Milestones, Actions or Checklist Items) have a Status of Planned if the Status of the child is being set to In Progress
  • For the child in a Finish to Start relationship, ensure all parent records (e.g. Milestones, Actions or Checklist Items) have a Status of Complete or Cancelled if the Status of the child is being set to In Progress
  • For the child in a Finish to Finish relationship, ensure all parent records (e.g. Milestones, Actions or Checklist Items) have a Status of Complete or Cancelled

If the field is set to TRUE and the parent records fall outside of this criteria, the User will receive an on-screen notification advising why the child Action is unable to be progressed.

Dependency Notifications

Previously dependency email notifications were issued based on the following criteria:

  • Finish to Start – email notification is sent to the Roles involved with the Child Action when the parent Status is set to Complete
  • Start to Start – email notification is sent to the Roles involved with the Child Action when the parent Status is set to In Progress

Each email notification was sent independently of any other dependencies tied to the same child record. For example, if Action C is a successor in Finish to Start relationships with Action A and Action B, an email would be sent when Action A was marked as Complete and another email would be sent when Action B was marked as Complete.

The distribution of these email notifications has been adjusted to only send one email once all predecessors has reached the correct trigger point.

The ‘Dependency Email Notification’ will be issued to those Roles involved in the child record to be notified that all predecessors have reached the correct Status value in order for work to commence on the child Action.

If a record is updated and is a predecessor (parent) in a dependency relationship to any successor (child) and all other predecessor records have already reached their trigger point, the email will be sent:

  • Finish to Start: Predecessor Status is Complete or Cancelled
  • Start to Start: Predecessor Status is In Progress or Cancelled

Below is an example of the Dependent Email Notification:

18. Dependency Notification Email

Note: In order for a Role to receive these email notifications, the ‘Receive Dependency Notifications’ field on their Role record should be set to TRUE.

Timesheet

A number of enhancements have been applied to the Timesheet. The details of each enhancement is included below.

Approvals Tab Settings

You are able to select which fields are visible on the Approvals Tab of the Timesheet. By default, the following fields will all be displayed:

19. Timesheet Approvals Tab

Within the Timesheet Settings, you are able to select specific fields to be hidden, as shown below.

20. Timesheet Settings Approval Tab

This can be controlled by individual Users by modifying their own Timesheet Settings directly on the Timesheet. Alternatively, if you are using the Timesheet Settings on the Control Pad to override individual User preferences, it can be managed there as well.

Exclude Cancelled Actions

The query logic for the Timesheet has been adjusted so that Actions with a Status of ‘Cancelled’ will not be included in the list of displayed Actions. These Actions are also excluded from the manual lookup section at the bottom of the Timesheet.

Hide Time Log Modal Fields

You can choose to hide standard fields from the Time Log Information Modal. By default, the Modal provides Users with access to the following fields:

21. Timesheet Time Log Information Modal

Within the Timesheet Settings, you are able to select specific fields to be hidden, as shown below.

22. Timesheet Settings Time Log Modal

This can be controlled by individual Users by modifying their own Timesheet Settings directly on the Timesheet. Alternatively, if you are using the Timesheet Settings on the Control Pad to override individual User preferences, it can be managed there as well.

Exclude Roles from Timesheet

You are able to exclude specific Roles from the Lookup on the Timesheet, so when you’re searching for a Role, you can choose to exclude specific Roles (e.g. Placeholders, Clients, etc.).

This is controlled by the following field on the Role record:

  • Exclude from Timesheet

This field can be found in the ‘Permission/Notification Settings’ section of the Role page.

If this field is set to TRUE, the Role will not be accessible in the Lookup for the Timesheet or the Log Time component.

Scheduler

A number of enhancements have been applied to the Scheduler. The details of each enhancement is included below.

Project Tab Hover Content

The Hover Box that appears when you hover over a bar on the Scheduler when on the Project View Tab displays the following information by default.

23. Scheduler Project Hover Default

You are able to replace these default values by adding fields into the ‘Project Scheduler Hover’ Field Set, which is available on the Project Object within Salesforce Setup.

24. Scheduler Project Hover Field Set

Once you’ve added your required fields to the Field Set, they will be visible in the Hover Box, along with the ‘Scheduled This Period’ and ‘Remaining This Period’ information.

25. Scheduler Project Hover Custom

To reset to the default values, you need to remove all fields from the Field Set.

View All Holidays / Approved Holidays

To provide flexibility for customers to choose whether they view all Holidays or only approved Holidays on the Scheduler, there is a setting within the Scheduler Settings that enables you to choose whether you view:

  • Approved Holidays
  • All Holidays

If this setting is null, only Approved Holidays will be displayed on the Scheduler.

26. Scheduler Settings Holiday Source

When viewing Holidays on the Scheduler, Approved Holidays will display in Red and any other Holidays will display in Amber.

27. Scheduler Holidays

View All Roles / Assigned Roles

To provide flexibility for customers when using the Scheduler, to choose whether they view all Roles or only Roles assigned as Action Owners or Contributors, there is a ‘Display Roles’ filter within the Scheduler Filters that enables you to choose whether you view:

  • Assigned Roles
  • All Roles

When viewing the Scheduler via the Project Overview or the Scheduler Anywhere component, this Filter will be set to ‘Assigned Roles’ by default. Therefore, you will only see a list of Roles that are assigned as either an Action Owner or a Contributor.

28. Scheduler Setting Display Roles

When viewing the main Scheduler, Users will be able to select whether they view ‘All Roles’ or ‘Assigned Roles’.

Project Overview / Scheduler Anywhere Loading

By default, the main Scheduler loads up with the first day being Today. When viewing the Scheduler via the Project Overview or the Scheduler Anywhere component, the Scheduler will load the first day of the Timeline to be the first day of the Project(s) displayed.

Filter Enhancements

The Scheduler Filters has been updated to provide the ability to search based on Project ‘Status’.

29. Scheduler Filter Project Status

The Project Status filter is located below the Categories filter.

Whiteboard

A number of enhancements have been applied to the Whiteboard. The details of each enhancement is included below.

Filter Enhancements

The Whiteboard Filters feature has had a number of enhancements, which include the following.

Role Filter AND/OR Toggle

Previously, the filter logic between the various Role Filter options was OR. For example, if you apply a Filter on Team and Skill, the logic applied to the search is Team = X OR Skill = X.

A master AND/OR toggle has been added to the Role Filters section. This enables Users to search for Roles where Team = X AND Skill = X.

30. Whiteboard Role Filters

The master toggle allows you to apply AND or OR logic across the following Filter Options:

  • Project Owners
  • Teams
  • Skills
  • Proficiencies
  • Action Owners
  • Contributors

The User’s preference will be persistently remembered in the same way the existing AND/OR toggles work.

Custom Field Filters

You are able to apply up to 2 Custom Field Filters as part of your Whiteboard Filter Options.

31. Whiteboard Custom Field Filters

The filter logic between these 2 Custom Fields is AND.

Exclude from Whiteboard

If you have Actions that you wish to exclude from the Whiteboard, you are able to set the ‘Exclude from Whiteboard’ field to TRUE. This field is available to be applied at the Project, Milestone or individual Action levels.

If you apply it at the Project, all Actions on that Project will be excluded from the Whiteboard. If you apply it at the Milestone level, all Actions relating to the Milestone will be excluded from the Whiteboard.

Any Action that has the ‘Exclude from Whiteboard Indicator’ field set to TRUE will be excluded from the Whiteboard.

Create New Milestone

A new button has been added to the Whiteboard header, enabling you to add a new Milestone to an existing Project.

32. Whiteboard Add Milestone

When you click the ‘Add Milestone’ button, it will open the standard Milestone Page Layout. Once you click Save within the Modal, the Milestone will be created and will be available for you to reference from the Whiteboard.

Column Heading Setting – Project Overview

The ‘Column Heading’ setting on the Whiteboard is persistently remembered when you visit the Whiteboard each time. If you filter the main Whiteboard down to view only 1 Project, you are able to set the Column Heading to ‘Milestone’. However, this will not be persistently remembered.

You can set a separate persistent value for the ‘Column Heading’ for when you are viewing the Whiteboard via the Project Overview.

33. Whiteboard Column Heading

This enables Users to set the persistent ‘Column Heading’ to be Milestone in context of the Project Overview if required.

Role Utilisation Report

A number of enhancements have been applied to the Role Utilisation Report. The details of each enhancement is included below.

Exclude Projects, Milestones & Actions

If you have Actions that you wish to exclude from the Role Utilisation Report, you are able to set the ‘Exclude from Utilisation’ field to TRUE. This field is available to be applied at the Project, Milestone or individual Action levels.

If you apply it at the Project, all Actions on that Project will be excluded from the Role Utilisation Report. If you apply it at the Milestone level, all Actions relating to the Milestone will be excluded from the Role Utilisation Report.

Any Action that has the ‘Exclude from Utilisation Indicator’ field set to TRUE will be excluded from the Role Utilisation Report.

Hours per Week

Previously all Active Roles included in the Role Utilisation Report would display as having been available throughout the entire reporting period, setting the ‘Hours per Week’ as the value currently set on their Role record.

This would inaccurately report that a Role had not met their utilisation targets, even if they were not yet an available Role to be assigned to Projects.

For example, let’s say I was running a Role Utilisation Report from 1st Jan to 31st Mar and I have included Mick, Kelly and Joel on the report. If Mick only started with the company on the 1st Mar, the report would have shown that he had achieved 0% of his Utilisation / Billable Target for the period 1st Jan to 28th Feb.

With the introduction of Role Availability records, which can be created via the Manage Availability page on the Role record, the ‘Hours per Week’ could vary for different weeks / months within the reporting period. These Role Availability records are taken into account for the reporting periods they cover.

The Hours per Week field will display 0 if both of the following criteria apply:

  • There is no Role Availability record for the Role for the period and the Hours per Week field on the Role is 0 or null
  • The Role Created Date is greater than the reporting period

The Role Utilisation Report will reference the applicable Role Availability record(s). If no Role Availability records exist, the Role ‘Hours per Week’ field will be referenced instead.

Reference Role Allocations & Role Actuals

For customers using the Resource Forecasting functionality, the Role Allocation & Role Actual data will be used within the Role Utilisation Reporting. The table below outlines the report values that will reference data from these Objects.

Report Value Data Source
Holiday Hours Role Actuals relating to the Holidays applicable to the reporting period for the week/month
Total Hours Scheduled Role Allocations relating to the Actions applicable to the reporting period for that week/month

For customers not using the Resource Forecasting functionality, the figures will be taken directly from the Actions, Time Logs & Holidays.

Resource Assignment Wizard

A number of enhancements have been applied to the Resource Assignment Wizard. The details of each enhancement is included below.

Include Salesforce Events

You are able to include hours from Salesforce Event records within the figures that show a Role’s availability. Users can choose whether to factor in these Event hours based on a setting within the Custom Settings within the Resource Assignment Wizard.

34. RAW Include Events Setting

When this setting is TRUE, the Hours Summary will incorporate Salesforce Event hours and you will see an additional row for ‘Event’ hours in the Hours Breakdown section.

35. RAW Event Hours

When this setting is FALSE, the Salesforce Event hours will not be included. This setting is controlled by each individual User within the Resource Assignment Wizard Custom Settings.

Include Role Forecast Hours

You are able to include hours from Role Forecast records within the figures that show a Role’s availability. Users can choose whether to include Role Forecast hours based on a setting within the Custom Settings within the Resource Assignment Wizard.

36. RAW Include Forecast Hours Setting

When this setting is TRUE, the calculations for the hours / percentage figures within the ‘Potential Resources’ section of the Resource Assignment Wizard will include the hours from Role Allocation records related to Role Forecast records. These hours will be included in the Hours Summary and incorporated within the Billable and Non Billable values on the Hours Breakdown.

When the Include Forecast Hours setting is TRUE, the User will need to specify the source of hours in the ‘Action / Role Forecast Hours Source’ setting, selecting from the following options:

  • Forecasts – this option will only include Role Allocation records that relate to Role Forecast records
  • Actions – this option will only include Role Allocation records that relate to Action records
  • Both (Forecast Wins) – this option will include Role Allocation records that relate to Role Forecast or Action records. Where a Project has both Role Forecast records and Action records, the Role Allocation records related to the Role Forecast records will be included
  • Both (Action Wins) – this option will include Role Allocation records that relate to Role Forecast or Action records. Where a Project has both Role Forecast records and Action records, the Role Allocation records related to the Action records will be included

37. RAW Role Forecast Hours Source

When the Include Forecast Hours setting is FALSE, the Role Forecast hours won’t be included (e.g. it will be considered the same as Actions only).

Reference Role Allocations

For customers using the Resource Forecasting functionality, the Role Allocation data will be used within the Resource Assignment Wizard. The order in which data will be referenced for the hours is as follows:

  • Role Allocation records
  • JSON Hours Distribution (legacy feature for Actions only)
  • Actions & Holiday records

Where no Role Allocation or JSON files exist, the hours from the Actions & Holidays will be divided evenly across the working days between the Start Date and End Date.

Minor Enhancements

A number of minor enhancements have been made to various features. Each enhancement is detailed below.

Force Financials Recalculation

The Force Financials Recalculation process has been enhanced to also update Role Actual records that relate to Time Logs that are being amended.

Role Trigger

The Role Trigger logic has been enhanced to carry out the following processes:

  • Master Team field is populated on the Role record and there is no Team Assignment record for this Team, a new Team Assignment record will be created and the ‘Master Team’ Checkbox field will be set to TRUE. Any other Team Assignment for that Role that has the ‘Master Team’ field set to TRUE will be set to FALSE
  • Master Team field is populated on the Role record and there is already a Team Assignment record for this Team, but the ‘Master Team’ Checkbox field is set to FALSE. The ‘Master Team’ Checkbox field will be set to TRUE. Any other Team Assignment for that Role that has the ‘Master Team’ field set to TRUE will be set to FALSE
  • When a new Role is created, Role Allocation records will be created for the Role for any future Global Holiday records

Checklist Board

A persistent setting has been added to the Checklist Board to enable customers to utilise the sub-selection feature of the Column Heading.

38. Checklist Board Heading Options

When a User selects options to be displayed / hidden in the sub-section, they will be persistently remembered the next time they load the page.

Role Forecast Component

A persistent setting has been added to the Role Forecast component enabling Users to set their preference value for the Days/Weeks and number days/weeks view options.

39. Role Forecast Weeks Setting

Previously, these values would need to be set each time the User loaded the Role Forecast Component. They will now be persistently remembered the next time they load the page.

New Field Overview

A number of new fields have been added to the solution as part of this release. We recommend you add these fields to your Page Layouts. If you are not using the Permission Sets included with Mission Control, we recommend you check the Field Level Security for all of these fields to ensure all appropriate Profiles have the required access.

Project

Field Field Type Comments
Exclude from Whiteboard Checkbox Identifies if Actions relating to this Project should be excluded from the Whiteboard
Exclude from Utilisation Checkbox Identifies if Actions relating to this Project should be excluded from the Role Utilisation Report

Milestone

Field Field Type Comments
Exclude from Whiteboard Checkbox Identifies if Actions relating to this Milestone should be excluded from the Whiteboard
Exclude from Whiteboard Indicator Formula (Checkbox) Indicates if Actions relating to this Milestone should be excluded from the Whiteboard. If ‘Exclude from Whiteboard Field is set to TRUE, it takes this value, otherwise it takes the value from the Project ‘Exclude from Whiteboard’ field
Exclude from Utilisation Checkbox Identifies if Actions relating to this Milestone should be excluded from the Role Utilisation Report
Exclude from Utilisation Indicator Formula (Checkbox) Indicates if Actions relating to this Milestone should be excluded from the Role Utilisation Report. If the Milestone ‘Exclude from Utilisation’ field is set to TRUE, it takes this value. Otherwise it takes the value from the Project ‘Exclude from Utilisation’ field

Action

Field Field Type Comments
Exclude from Whiteboard Checkbox Identifies if this Action should be excluded from the Whiteboard
Exclude from Whiteboard Indicator Formula (Checkbox) Indicates if this Action should be excluded from the Whiteboard. If the Action ‘Exclude from Whiteboard’ field is set to TRUE, it takes this value. Otherwise it takes the value from the Milestone ‘Exclude from Whiteboard Indicator’ field
Exclude from Utilisation Checkbox Identifies if this Action should be excluded from the Role Utilisation Report
Exclude from Utilisation Indicator Formula (Checkbox) Indicates if this Action should be excluded from the Role Utilisation Report. If the Action ‘Exclude from Utilisation’ field is set to TRUE, it takes this value. Otherwise, it takes the value from the Milestone ‘Exclude from Utilisation Indicator’ field

Role

Field Field Type Comments
Exclude from Timesheet Checkbox Identifies this Role should be excluded from the Lookup fields on the Timesheet & Log Time Modal

How do I upgrade?

Mission Control will be made available based on the following release schedule.

17th June 2022 – Available for manual upgrade from the AppExchange

25th June 2022 – Automatic upgrade to all Sandbox Orgs

2nd July 2022 – Automatic upgrade to all Production Orgs

To manually upgrade to the new version of Mission Control in your organisation, please follow the steps below:

  1. Click www.aprika.com/mc-app
  2. Click the ‘Get it Now’ button
  3. Enter your login details (if required)
  4. Click ‘Install in Production’
  5. Click ‘Confirm and Install’ (you may need to login again at this stage)
  6. Select which users you want to install for (‘Install for All Users’ is recommended)
  7. Click ‘Upgrade’
  8. Click Next (on step 1. Approve Package API Access)
  9. Select who you want to grant access to (on Step 2. Choose Security Level)
  10. Click Next
  11. Click Install
  12. Add new fields to page layouts as required.

What’s New Webinar

We have pre-recorded the ‘What’s New’ webinar to provide further information on how to get the best out of the new features. To access this webinar, please view the ‘Release Notes’ section of the Mission Control Support Centre – www.aprika.com/mc-support

Feedback

Some of the new features included in this release of Mission Control have come from ideas submitted from existing clients. If you have an idea for enhancing Mission Control, you can submit it via email to [email protected].

Questions?

If you have any questions regarding this release notification, please do not hesitate to contact us at [email protected].

 

Get your 14 Day FREE TRIAL

Simply enter your email address below, and we will set you on your way to your Free Trial. Enjoy the ride!

This field is for validation purposes and should be left unchanged.

Get your 14 Day FREE TRIAL

Simply enter your email address below, and we will set you on your way to your Free Trial. Enjoy the ride!

This field is for validation purposes and should be left unchanged.

Sign up to our newsletter