December is when most consulting leaders start thinking about next year’s targets. Before you set them, it’s worth running a year-end utilisation review. How did your people actually spend their time this year, and what does that tell you about 2027?

A good utilisation review answers those questions. Done well, it’s not a hunt for underperformers. It’s a practical look at where capacity went, where revenue leaked and what needs to change so next year’s plan is realistic.

Here’s a simple way to run one in your consulting or advisory firm.

Why a Year-End Utilisation Review Matters

Utilisation is one of the clearest signals of health in a professional services business. Too low and margins suffer. Too high for too long and your best people burn out or leave.

The problem is that utilisation is often only checked month by month, in isolation. A year-end review steps back and looks for patterns: which teams were stretched, which roles sat on the bench, and which months were consistently quiet or overloaded.

Those patterns are what you need to set fair targets and plan capacity for the year ahead.

Start With Clean Data

Your review is only as good as your time data. Before you analyse anything, check that it’s complete and consistent.

  • Are all timesheets submitted and approved for the year?
  • Is time logged against the right projects and tasks?
  • Is billable and non-billable time clearly separated?
  • Are leave and public holidays recorded, so available hours are accurate?

If the answer to any of these is “not really”, fix it first. Our article on how to measure your billable utilisation walks through the calculation and the common traps.

Measure the Right Things

A single firm-wide utilisation number hides more than it shows. Break it down so you can see what’s really happening.

  • By role: senior consultants and analysts should have different targets and patterns.
  • By team or practice: one overloaded team can be masked by a quiet one.
  • By month: seasonal peaks and troughs tell you when to hire and when to plan internal work.
  • Billable versus productive: sales support, training and internal projects matter, but they should be planned, not accidental.

Compare actual utilisation with what was scheduled. A big gap between the two usually points to planning problems rather than people problems.

Ask the Right Questions

Numbers start the conversation. The useful part of a utilisation review is the discussion with your practice leads and project managers. A few questions that tend to surface real insight:

  1. Where did we consistently run above target, and what did that cost us in overtime, quality or turnover?
  2. Which roles or skills sat underused, and why?
  3. How much non-billable time went on work that could be reduced or charged for?
  4. Did our sales pipeline give delivery enough warning about upcoming demand?
  5. Which projects overran their estimates, and did that push other work back?

Write down the answers. They become the assumptions behind next year’s plan.

Turn Findings Into Next Year’s Capacity Plan

A review is only worth doing if it changes something. Use what you’ve learnt to set targets and plan capacity for 2027.

Set utilisation targets by role rather than one number for everyone, and leave room for leave, training and business development. Map known and likely work from your pipeline against available capacity, so you can see gaps months ahead. Then decide where you need to hire, upskill or adjust pricing.

For more ideas on setting realistic targets, see our guide to professional services utilisation benchmarks.

How Mission Control Helps

Mission Control keeps projects, time and resources together inside Salesforce, so your utilisation review starts from one reliable source rather than a pile of exported spreadsheets.

Time Logs are captured against project Actions and clearly marked as billable or non-billable. Utilisation reporting shows scheduled and actual hours by Role, team and period, so you can compare the plan with reality. And because projects connect to your Salesforce pipeline, the Resource Planner helps you see future demand and plan capacity before the work arrives.

Find out more about Mission Control’s time tracking and resource management capabilities.

Plan 2027 With Confidence

A year-end utilisation review doesn’t need to be complicated. Clean data, the right breakdowns and a few honest conversations will tell you more than any single metric. The result is a capacity plan your team can actually deliver.

Want to see how Mission Control gives consulting firms a clear view of utilisation and capacity? Request a demo and we’ll walk you through it.

trial-03

SALESFORCE PROJECT MANAGEMENT SOFTWARE

Ready for take off? Click below and take a look around with your free 14 day trial.

features-01

THE FEATURES

Explore and discover the latest features of our Mission Control software.

news-icon

NEWSLETTER

Join our email list for all the latest news and updates at Mission Control HQ.

This field is for validation purposes and should be left unchanged.

Get your FREE Trail

Simply enter your details below, and we will set you on your way to your Free Trial. Enjoy the ride!

This field is for validation purposes and should be left unchanged.

Sign up to our newsletter

This field is for validation purposes and should be left unchanged.